BathroomsStarted August 2026In progress

Narrow shower room stripped back and rebuilt

A cramped tenement WC taken back to the stone and joists and rebuilt as a walk-in shower room with a linear drain and recessed lighting.

The room started as a long, narrow WC with a dated toilet, lath and plaster walls and old tiling coming away from the wall. Everything came out: sanitaryware, wall coverings and floor, leaving the stone, the timber lath and the ceiling joists open so the state of the structure could be seen before anything new went back.

With the floorboards lifted, new hot and cold pipework and waste runs were set out between the joists and the cabling for the lighting, extract and shaver point was pulled in at the same time. New timber studwork was framed against the old walls to bring them straight and to carry the shower valve, the recessed niche and the fixings, and the floor was decked ready for the shower former and linear drain. Boarding followed, with the mechanical extract ducted out at high level.

Finished, the room is a walk-in shower running the full width of the space, tiled floor to ceiling in a stone-effect porcelain with a fitted niche, brass shower valve, riser and towel rail. Lighting is a mix of ceiling downlights, concealed strip lighting above the shower and in the niche, and a backlit oval mirror, all wired and tested as part of the same job. Glasgow tenement bathrooms are rarely square, so the tiling was set out to keep the joints running true down the length of the room.

Every stage of the job

Strip-out

Narrow WC stripped to lath and plaster with old toilet still in place and ceiling joists exposed1 / 5
Strip-outNarrow WC stripped to lath and plaster with old toilet still in place and ceiling joists exposed

First fix

Floorboards lifted showing new copper and plastic pipework and cabling run between the joists2 / 5
First fixFloorboards lifted showing new copper and plastic pipework and cabling run between the joists
Timber studwork framed against the stripped walls with the floor decked out3 / 5
First fixTimber studwork framed against the stripped walls with the floor decked out

Second fix

Plasterboarded walls with extract ducting at high level and cables left ready for fittings4 / 5
Second fixPlasterboarded walls with extract ducting at high level and cables left ready for fittings

Visualisation

Visualisation of the finished walk-in shower room with stone-effect tiling, lit niche and brass fittings5 / 5Visualisation
Visualisation — not a photoVisualisation of the finished walk-in shower room with stone-effect tiling, lit niche and brass fittings